IESCO New Connection
Getting a new electricity IESCO new connection with Islamabad Electric Supply Company (IESCO) is an important step for any new homeowner or business in Islamabad, Rawalpindi, Attock, Jhelum, and Chakwal. IESCO provides reliable and efficient power supply to these areas. This guide explains the complete process for getting a new electricity connection from IESCO.
Requirements for IESCO New Connection
To apply for a new electricity connection, you need to arrange some important documents. Here is the list:
Make sure all documents are completed properly to avoid any delay or rejection.
Check your IESCO Bill Online here.
How to Apply for IESCO New Connection
There are two ways to apply for a new connection: online and by visiting the IESCO office
Online Application Method:
Office Application Method:
Verification And Demand Notice for IESCO New Connection
After you submit your application and documents:
IESCO New Electricity Connection Charges
The charges for a new connection depend on the type of meter and the length of the service line.
Single Phase Meter Charges:
Sr.No | Length of Service | Cost |
1 | Up to 20 meters | Rs. 8,500/- |
2 | Above 20 and up to 30 meters | Rs. 10,500/- |
3 | Above 30 and up to 40 meters | Rs. 11,500/- |
4 | Above 40 meters and up to 100 meters (with one span LT with Ant Conductor and one Pole, excluding Housing Societies | Rs. 11,000 + Rs. 800 per meter above 40 meters |
5 | Above 100 meters and up to 160 meters (with two span LT with Ant Conductor and two Poles, excluding Housing Societies) | Rs. 60,000 + Rs. 1000 per meter above 100 meters |
Three Phase Meter Charges:
Length of Service | Cost |
Up to 20 meters | Rs. 36,500/- |
Up to 30 meters | Rs. 43,000/- |
Up to 40 meters | Rs. 50,000/- |
Above 40 meters | Actual cost of LT Pole and allied material based on latest IESCO rates |
Time Required for IESCO New Connection
The time taken for a new electricity connection depends on your load requirements:
Description | Days |
Up to 400V and load up to 15KW | 30 days |
Up to 400V and load above 15KW but not exceeding 70KW | 53 days |
Up to 400V and load above 70KW but not exceeding 500KW | 73 days |
Up to 400V and load above 500KW but not exceeding 5000KW | 106 days |
At voltage level 66KV and above for all loads | As per specific case |
Meter Installation and Testing
After payment verification:
Once everything is checked and working properly, IESCO will activate your final electricity connection.
Energy Conservation Tips
After getting your new electricity connection, save energy and reduce your electricity bills by: